检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
机构地区:[1]黄河勘测规划设计有限公司工程物探研究院,河南郑州450003
出 处:《工程地球物理学报》2012年第2期216-220,共5页Chinese Journal of Engineering Geophysics
摘 要:当前,大坝、高层建筑的地基都需要进行模量值的确定,而跨孔地震波法是常用的方法,但如果测试时孔间距选择不合理,获取的不是直达波或者是非所求层的直达波。本文通过对二层地质结构激振后所产生的波系及其正演时距方程做出P、S波系的时距曲线,根据时距曲线确定了几个特征点的坐标,然后由直达波的时距方程计算出了S1波初至不受P1波续至振动干扰的最小距离x,最终确定了选择合理孔距的方程式,并通过一个工程实例来说明。Today,the dam and high buildings' foundation should be confirmed by the modulus.The cross-hole seismic wave method is a common one,but if the pitch is unreasonable during testing,the direct wave can not be obtained or the obtained layer of the direct wave is not wanted.The paper takes a time-distance curve of P-wave and S-wave based on the waves produced by vibrating the geological structure with two layers and their forward-calculated time-distance equation.It determines the coordinates of several feature points according to the above curves.Then it uses the direct wave time-distance equation to calculate the minimum distance x that S1-wave not interfered with the vibration of the P1-wave's second wave.At last the equation of the right pitch is determined and an example is illustrated.
分 类 号:P631.4[天文地球—地质矿产勘探]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.4