检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:黄璜[1] 任宗栋[1] 默增禄[1] 李士锋[1] 王智飞[1]
出 处:《电力建设》2012年第4期28-31,共4页Electric Power Construction
摘 要:钢管塔塔身变坡处大多采用大板对焊式或法兰螺栓连接式2种方案连接塔身上下主管,保证传力清晰合理。对淮南—上海1000kV特高压交流双回路SJ276转角塔塔身变坡节点分别采用2种方案的连接方式进行了经济性和可靠性计算分析比较。结果表明,只要在设计参数取值合理的情况下,2种方案的塔身变坡节点都是安全可靠的,但是法兰螺栓连接式方案更节省塔材,塔重减轻约2%。In order to achieve a simple structure and definite transit route of load,either weld with plate or bolts connection should be provided at the section with slope change on the main member of steel tubular tower.Taking the SJ276 tower for 1 000 kV AC double circuits transmission line from HuaiNan to ShangHai,weld with plate and bolts connection are respectively applied.The economical efficiency and security of applying two connections in the SJ276 tower are analyzed.The results indicate that the tower is safe entough under two connections,while the weight of tower can be reduced about 2% by applying bolts connection.
分 类 号:TM753[电气工程—电力系统及自动化]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.222