1000kV特高压钢管塔塔身变坡节点的优化设计  被引量:6

Optimization Design of Jiont with Slope Change on 1 000 kV UHV Steel Tubular Tower

在线阅读下载全文

作  者:黄璜[1] 任宗栋[1] 默增禄[1] 李士锋[1] 王智飞[1] 

机构地区:[1]国核电力规划设计研究院,北京市100032

出  处:《电力建设》2012年第4期28-31,共4页Electric Power Construction

摘  要:钢管塔塔身变坡处大多采用大板对焊式或法兰螺栓连接式2种方案连接塔身上下主管,保证传力清晰合理。对淮南—上海1000kV特高压交流双回路SJ276转角塔塔身变坡节点分别采用2种方案的连接方式进行了经济性和可靠性计算分析比较。结果表明,只要在设计参数取值合理的情况下,2种方案的塔身变坡节点都是安全可靠的,但是法兰螺栓连接式方案更节省塔材,塔重减轻约2%。In order to achieve a simple structure and definite transit route of load,either weld with plate or bolts connection should be provided at the section with slope change on the main member of steel tubular tower.Taking the SJ276 tower for 1 000 kV AC double circuits transmission line from HuaiNan to ShangHai,weld with plate and bolts connection are respectively applied.The economical efficiency and security of applying two connections in the SJ276 tower are analyzed.The results indicate that the tower is safe entough under two connections,while the weight of tower can be reduced about 2% by applying bolts connection.

关 键 词:钢管塔 变坡节点 焊接 法兰 特高压 

分 类 号:TM753[电气工程—电力系统及自动化]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象