检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:刘博[1] 贺虎[1] 李伟[1] 宋继明[1] 王志强[1] 聂琼[1]
机构地区:[1]国家电网公司交流建设分公司,北京市100052
出 处:《电力建设》2012年第4期93-97,共5页Electric Power Construction
摘 要:1000kV荆门特高压变电站扩建工程是特高压交流试验示范工程首次扩建的重要组成部分,工程建设管理具有突出的特点、难点。建设管理单位切实履行现场主责主导作用,针对工程的特点与难点,从安全、质量、技术、进度等方面实施了针对性管控措施,实现了预期的建设目标。The extension project of 1 000 kV UHV Jingmen station is an important part of the first extension pilot project of UHV AC transmission.Construction management of this project has outstanding characteristics and difficulties.The manage department has performed main responsibility and leading at construction site,and taken a series of management and control measures in terms of safety,quality,technology and progress based on the project's characteristics and difficulties.This project's construction management and control strategy has achieved the construction goal.
分 类 号:TM75[电气工程—电力系统及自动化]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.3