机构地区:[1]浙江工业大学建筑规划设计研究院有限公司,杭州310014
出 处:《建筑技术》2012年第4期365-367,共3页Architecture Technology
基 金:浙江省重大科技专项资助项目(2010C13012)
摘 要:某20层框架剪力墙结构办公楼位于7度抗震设防区,在施工至第10层时,发现第4层4片墙柱混凝土强度严重偏低,不能满足原设计C40的强度要求。经过比选,确定采用分批置换混凝土法进行加固,通过合理布置临时支撑,采用具有早强、高强、自流性的灌浆料浇筑,并对加固过程进行全程监测,取得良好的加固效果。A 20-story office building of frame-shear wall structure was being built in 7 degree area. When the 10th floor was being built, it is found that 4 wall-columns" grade of concrete strength was less than C40 in the 4th floor. The concrete-replacing method was used to solve this problem. The effect of reinforcement is good with the reasonable temporary supports and the grouting material which is early-strength, high-strength and flow automatically. All of the reinforcement process was in the monitoring.
关 键 词:混凝土置换 框架剪力墙 临时支撑 灌浆料 加固 粘钢
分 类 号:TU746.3[建筑科学—建筑技术科学]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.112