检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
机构地区:[1]中国电力科学研究院,北京100192 [2]上海虹桥国际机场公司,上海200335 [3]浙江省电力试验研究院,浙江杭州310000
出 处:《电网与清洁能源》2012年第3期56-60,共5页Power System and Clean Energy
摘 要:指出了分时竞价方式的弊端,讨论了分段竞价方式的概念、运行方式、规则和规模,并以具体实例对分段竞价和分时竞价方式进行了模拟,分别求出了2种报价策略下的总购电费用。结果表明总费用与报价模式没有必然联系,其取决于报价策略,并提出了分段竞价理论的研究方向。The paper points out drawbacks of the hourly bidding model, and introduces the concept of the block bidding mode, operation model, rules and scale. Specific examples of the block bidding and the hourly bidding are simulated, and the power purchase costs under the two biddings formats are obtained respectively. The study result shows that the total power purchase cost is not relevant to the pricing model, but depends on the bidding strategies. The paper also discusses the research direction of the block bidding theory.
分 类 号:TM73[电气工程—电力系统及自动化]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.26