考虑分布式电动汽车参与电网调峰的配电网规划  被引量:24

Distribution network planning considering distributed EVs for peak shaving

在线阅读下载全文

作  者:杨洪明[1] 黄雨翔[1] 刘保平[1] 易德鑫[1] 王斌[1] 

机构地区:[1]长沙理工大学电气与信息工程学院,湖南长沙410004

出  处:《电力科学与技术学报》2012年第1期48-53,共6页Journal of Electric Power Science And Technology

基  金:国家自然科学基金(71071025;70925006);湖南省杰出青年科学基金(10JJ1010);教育部新世纪优秀人才支持计划(NCET-08-0676);湖南省自然科学基金衡阳市联合基金(10JJ8008)

摘  要:大量电动汽车接入网络为电力系统的经济可靠运行带来了新的机遇和挑战,含V2G功能的电动汽车充电站可利用闲置的电动汽车作为储能装置在用电高峰期将电能反馈回电网,实现电动汽车作为移动式分布储能单元参与电网的调峰.从供电公司和电动汽车充电站投资商的角度出发,以配电网规划区域电动汽车充电站投资、变电站和线路投资、网络损耗与电动汽车参与电网调峰所增加的附加费用之和最小为目标,建立考虑电动汽车参与电网调峰的配电网规划数学模型,并以配电网经济可靠运行的各种限制为约束条件,实现配电网络的合理规划.最后通过算例分析结果证明了所提方法的可行性和有效性.The increasing proportion of electric vehicles(EVs) connected into distribution networks will bring new opportunities and challenges for economic and reliable operation of power systems.By vehicle-to-grid(V2G)technology,the idle EVs in EV charging station can work as distributed energy storage devices,which can put the energy back to the grid at the peak.So large scale EVs can participate in the peak regulation of the power systems as the mobile distributed energy storage devices.Based on the characters analysis of EVs participating in the peak regulation,a distribution network planning method including V2G power for peak shaving was proposed in this paper.From the point of power supply companies and EV charging station investors,the new method aimed to minimize total investments of additional substations,distribution lines,EV charging stations and network loss considering the restraint condition of economic and reliable operation,A novel mathematical model of distribution network planning including EVs was proposed.An example analysis proved that the proposed method had feasibility and validity.

关 键 词:配电网规划 电动汽车 V2G 遗传算法 调峰 

分 类 号:TM715[电气工程—电力系统及自动化]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象