阿什河橡胶坝工程布置及坝袋相关设计  

Project Layout and Relevant Design of Dam Bag for Ashen River Rubber Dam

在线阅读下载全文

作  者:王波[1] 

机构地区:[1]黑龙江省水利水电勘测设计研究院,哈尔滨150080

出  处:《黑龙江水利科技》2012年第1期101-103,共3页Heilongjiang Hydraulic Science and Technology

摘  要:橡胶坝工程位于阿什河干流上,位于右岸桩号6+200位置处,是防洪结合拦河蓄水,以形成雍水水面,达到改善河流的自然景观的目的,属美化城市景观的水利工程。设计中要满足50 a一遇洪水宣泄要求,还要防止泥沙卷入坝袋底部增加磨损,有利于管理。The rubber dam project is situated on the main stream of the Ashen River,at the pile No.6+200 of the right bank,and it is to form a backwater surface by combing flood control with water storage by blocking the river to realize improving the natural landscape of the river.The project is a hydraulic project beautifying urban landscape.In the design,the demand for 50-year flood needs to be met,and also need to prevent sediment flowing into the bottom of dam bags so as to make it easy for us manage the project.

关 键 词:橡胶坝 总体布置 充水式坝袋 锚固 水泵选型 

分 类 号:TV644[水利工程—水利水电工程]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象