检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:陈鑫[1]
机构地区:[1]中国人民武装警察部队学院,河北廊坊065000
出 处:《消防科学与技术》2012年第4期404-407,共4页Fire Science and Technology
基 金:公安部应用创新项目"建筑倒塌事故救援中局部扰动诱发结构连续倒塌问题研究"(2008YYCXWJXY119)
摘 要:归纳总结汶川地震的典型受损建筑特征及采用的救援技术。应用ANSYS有限元方法计算施加顶撑荷载前、后震损建筑在地震荷载作用下的反应,数值模拟顶撑位移作用下的受损建筑。分析结果表明:施加顶撑后结构的抗连续倒塌能力显著提高;顶撑距离过大,可能拉断构件或发生剪切破坏,故顶撑位移应为可进行救援的最小位移。The character of earthquake damaged structure and typical rescue technique in Wenchuan earthquake were summarized.Using ANSYS finite element analysis,seismic response of damaged models was analysed and the shoring displacement was numerically simulated.The results showed that shoring method can improve the progressive collapse behavior greatly;when the shoring displacement is too big,the member may be pulled off,or have shear stress damage,so the shoring displacement should be the minimum distance for rescuing.
分 类 号:X913.4[环境科学与工程—安全科学] P315.9[天文地球—地震学]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:3.143.218.86