检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:吕兆海[1] 张建华[1] 黄相明[1] 靳华[1] 韩涛[1] 陈博文[1]
机构地区:[1]神华宁夏煤业集团有限责任公司,宁夏银川750004
出 处:《煤》2012年第4期1-2,45,共3页Coal
摘 要:结合清水营煤矿综采工作面实际情况,介绍了综采设备安装回撤的全过程。支架撤除期间的顶板管理工作是影响工程进度的制约因素,在回撤期间采用树脂纤维网片控制顶板技术;引进鑫丰公司以支架搬运车为主的快速搬家装备,达到安全、快速地撤除支架的目的,不仅缩短了工期、提高了工效,而且增大了安全系数,该套技术是对回撤工艺的一次创新和实践。Combined with the actual situation of fully mechanized coal face of Qingshuiying Coal Mine, to introduce entire process of mining equipment installed retracement at fully mechanized coal face. Roof work is restrict factor which affected progress of project con- straints during stent removal period, it was adopted fiber mesh control roof technology during removing period ; it was introduced bracket the van - based fast moving equipment of Xinfeng company, to achieve safe and fast removal of stent is safe, not only saves time limit, improved ergonomics, but also increases the safety factor,it is innovations and practices of retracement of the process.
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.3