检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
机构地区:[1]中铁四局博士后工作站,安徽合肥230023 [2]合肥工业大学土木与水利工程学院博士后流动站,安徽合肥230009 [3]中铁四局第二工程有限公司,江苏苏州215131
出 处:《桥梁建设》2012年第2期92-97,共6页Bridge Construction
基 金:安徽省博士后资助项目(201084615)~~
摘 要:为了保证葑溪大桥的施工安全和质量,根据预应力混凝土斜拉桥悬臂浇筑和支架现浇非对称施工特点,建立施工控制计算模型,探讨影响主梁线形及斜拉索索力的因素,并制定相应控制措施,对主梁线形、内力、索力、牵索挂篮应力和变形进行有效监控。施工控制结果表明:成桥状态下,主桥轴线实测标高、桥梁应力状态、成桥索力均满足设计要求,挂篮在施工过程中的应力状态及变形情况与试验变化趋势基本一致。To ensure the construction safety and quality of the Fengxi Bridge, a prestressed concrete cable-stayed bridge and in the light of the asymmetric construction characteristics of can- tilever casting and casting of the bridge on scaffolding, a calculation model for the construction control of the bridge was established, the factors having influences on the geometric shape of the main girder and on the stay cable forces of the bridge were studied and the corresponding meas- ures were formulated for the effective monitoring and control of the geometric shape and internal forces of the main girder, the stay cable forces and the stress and deformation of the guyed form travelers. The results of the construction control show that in the state of the completed bridge, the measured elevation of the axis of the main bridge, the stress conditions and the stay cable forces can all accord with the design requirements and the stress conditions and deformation of the guyed form travelers in the construction process are basically identical to the change tendency of the stress and deformation in the testing.
关 键 词:斜拉桥 施工监控 悬臂灌筑架桥 支架 应力 变形
分 类 号:U448.27[建筑科学—桥梁与隧道工程] U445.1[交通运输工程—道路与铁道工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.249