超低渗透油藏超前注水开发效果分析及对策  被引量:15

Effect analysis and countermeasures of advanced water flooding for ultra-low permeability reservoirs

在线阅读下载全文

作  者:胡书勇[1] 雒继忠 周志平 马立军 令永刚 

机构地区:[1]油气藏地质及开发工程国家重点实验室西南石油大学,四川成都610500 [2]中油长庆油田公司,甘肃庆阳745100

出  处:《特种油气藏》2012年第2期66-68,138,共3页Special Oil & Gas Reservoirs

基  金:教育部博士点基金“三维大变化尺度缝洞型碳酸盐岩油藏复杂油水两相流动规律研究”(20105121110006)

摘  要:长63油藏属超低渗低压油藏,天然能量较弱。超前注水后全面投入开发,投产初期单井产量低,含水率变化稳定,部分油井压力下降,部分注水井压力上升。研究认为:在目前井网条件下,部分井组井距过大,没有建立起有效的驱替压力系统,要形成有效驱替必须缩小井距;笼统注水使得注采层位不对应,造成油井产液量较低。通过研究,提出下步调整措施,即进一步细分层系,加密井网,缩小注采井间的距离。现场实施后效果显著。The Chang 63 reservoir is an ultra-low permeability,low pressure reservoir with week natural energy.After advanced water injection,the reservoir was put on full-scale production.In the early production period,per well production was low,water cut was stable,and pressure dropped in some oil wells while rose in some water injection wells.It has been realized through research that with present well pattern,well spacing is too large to establish effective driving pressure system in some well groups,and it is necessary to reduce well spacing in order to form effective flooding;in addition,commingled water injection has resulted in non-corresponding horizons of injection to production,leading to low liquid production from oil wells.The adjustment measures proposed through the research include further subdividing layers,infilling well pattern,and reducing injection-production well spacing.

关 键 词:超前注水 水驱效果 压力系统 注水开发 井网井距 长63油藏 

分 类 号:TE33[石油与天然气工程—油气田开发工程]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象