机构地区:[1]四川大学水力学与山区河流开发保护国家重点实验室,成都610065
出 处:《水力发电学报》2012年第2期49-55,共7页Journal of Hydroelectric Engineering
基 金:新世纪优秀人才计划资助项目(NCET-08-0378);教育部重点资助项目(2008108111)
摘 要:某水电站是目前采用"宽尾墩+消力池"联合消能工中坝高最大的水电工程,加之流量大,洪峰频率高,泄洪建筑物运用频繁,其泄洪消能问题十分突出。本文通过水工模型试验研究,对表孔宽尾墩体型设计参数进行了优化,同时对比分析了长、短消力池的流态、水面线、压力分布、临底流速等水力特性,提出了一个水力学较优的消能工体型布置方案。实测结果表明,消力池底板时均冲击压力高达42.9(9.81kPa),脉动压力高达10(9.81kPa).恰当增加消力池长度对于降低消力池出池水流波动和减轻下游河道冲刷有利。试验成果已为实际工程的消能防冲设计提供了重要的参考依据。The hydropower station presented in this paper is the highest dam project adopted "flaring gate pier and stilling basin" united energy dissipator in China,which was provided with the characters of large discharge,high flow flood emerged frequently,and flood discharging structures used frequently,so it is very important to study the problems about energy dissipation.In this paper,by hydraulic experiments,we optimized the structure parameters of flaring gate piers on surface spillway.Additionally,the hydraulic characters of short and long stilling basins were compared and analyzed,such as flow pattern,water surface,pressure distribution,close-to-bed velocity.The results show that the average impact pressure and the fluctuating pressure of the stilling basin bottom reach 42.9(9.81kPa) and 10(9.81kPa) respectively.It is also found that increasing the length of the plunge pool appropriately do well to reduce the flow fluctuation of stilling basin outflow and to lighten the flow scour of the downstream.So a relatively good flood discharging structures combination is proposed,which provides strong references for the design of energy dissipation.
关 键 词:水力学 宽尾墩 体型优化 消力池 压力特性 试验研究
分 类 号:TV135.2[水利工程—水力学及河流动力学]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.30