新型锚块在预应力闸墩设计中的研究与应用  被引量:3

Study on New Anchor Block in the Design of Pre-stressed Pier

在线阅读下载全文

作  者:韩韬[1] 张建辉[1] 张喜武[1] 夏辉[1] 张亚迅[2] 雷秀玲[1] 

机构地区:[1]中水东北勘测设计研究有限责任公司,吉林长春130021 [2]南水北调中线干线工程建设管理局河北直管项目建设管理部,河北石家庄050035

出  处:《水力发电》2012年第5期31-33,共3页Water Power

摘  要:蒲石河抽水蓄能电站下水库泄洪排沙闸工作闸门单墩承受最大推力为34 000 kN,推力较大,预应力闸墩采用空腔式新型锚块可以有效降低吨锚比,改善结构应力条件,节省工程量。应用ANSYS有限元分析程序对预应力闸墩进行数字仿真模拟,确定锚块及空腔尺寸、锚束位置及吨位,并通过物理力学模型试验,对重要部位进行应力检测,验证数学模型结果的可靠性。The single pier of flood discharging and sand gate in the lower reservoir of Pushihe Pmnped-storage Power Station will bear a maximum thrust of 34 000 kN. The pre-stressed pier adopts a new hollow anchor block which can effectively reduce the ratio of anchor beam capacity to thrust, improve the structural stress and reduce the constructing quantity. The numerical simulation for pre-stressed pier is conducted by using ANSYS to determine the sizes of anchor block and cavity, and the anchor beam position and capacity. The physical model testes are also conducted to examine the stress of important positions and to verify the reliability of mathematical model results.

关 键 词:预应力闸墩 空腔式锚块 有限元 模型试验 蒲石河抽水蓄能电站 

分 类 号:TV662.2[水利工程—水利水电工程]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象