蒲石河抽水蓄能电站引水隧洞下平段断层处理  

Treatment of Faults in Lower Horizontal Section of the Headrace Tunnel in Pushihe Pumped-storage Power Station

在线阅读下载全文

作  者:张建辉[1] 马龙彪 景健伟[1] 张军 王晓丽[1] 刘洋[1] 

机构地区:[1]中水东北勘测设计研究有限责任公司,吉林长春130021 [2]辽宁蒲石河抽水蓄能有限公司,辽宁丹东118216

出  处:《水力发电》2012年第5期37-38,53,共3页Water Power

摘  要:蒲石河抽水蓄能电站引水隧洞下平段发育多条断层,属Ⅲ~Ⅳ类围岩。其中,规模最大的F3断层及上、下盘影响带宽约22~25 m。在开挖过程中,断层渗水严重,围岩局部稳定性差。介绍了蒲石河抽水蓄能电站引水隧洞下平段断层处理方案的确定过程,为类似工程的处理提供借鉴。The lower horizontal sections of headrace tunnel, in Pushihe Pumped-storage Power Station passes through some faults, in which, the width of the largest F3 fault zone is about 22-25 m. The water seepage is serious during tunnel excavation. The surrounding rock of headrace tunnel has poor stability. The determination of treatment program for these faults in project design is introduced herein. The practice provides a reference for the design of similar projects.

关 键 词:引水隧洞下平段 断层 渗透稳定 钢板衬砌 蒲石河抽水蓄能电站 

分 类 号:TV543.5[水利工程—水利水电工程]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象