蒲石河抽水蓄能电站引水隧洞钢管安装工艺  

Installation of Steel Liner Pipe on the Lower Sections of Headrace Tunnels in Pushihe Pumped-storage Power Station

在线阅读下载全文

作  者:焦宝林[1] 郭华[1] 赵伟[1] 潘立刚 

机构地区:[1]中国水利水电第六工程局有限公司,辽宁丹东118002 [2]辽宁蒲石河抽水蓄能有限公司,辽宁丹东118216

出  处:《水力发电》2012年第5期59-61,87,共4页Water Power

摘  要:介绍了在蒲石河抽水蓄能电站引水隧洞下平段断层处理工程中,采用600 MPa级高强钢衬管处理方案的确定和实施过程。在克服安装工期紧、空间狭小、焊接难度高和低温环境施工等不利条件的影响,提前完成了钢衬管的安装,解决了断层渗水问题,保证了电站的运行安全,可为类似工程的施工提供借鉴。The 600 MPa high strength steel liner pipe is used in the faults treatment of lower horizontal sections of headraee tunnels in Pushihe Pumped-storage Power Station. The determination of treatment program and the installation of steel liner pipes are described. After overcoming the adverse impacts of shorter eonstruetion duration, narrower space, diffieuh welding and lower temperature, the installations are completed in advance, and the water leakage from the faults is eliminated. The treatments guarantee the safe operation of station, and can be as reference for similar projects.

关 键 词:600 MPa级高强钢 压力钢管 施工方法 蒲石河抽水蓄能电站 

分 类 号:TV547[水利工程—水利水电工程]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象