检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
出 处:《船舶工程》2012年第2期43-45,95,共4页Ship Engineering
基 金:中央高校基本科研业务费专项资金资助(2011QN111);辽宁省重点实验室项目(LS2010019);辽宁省教育厅科技研究项目(2008S022)
摘 要:针对现场总线技术在综合电力网络控制系统中应用的不足,设计了将基于实时以太网的网络控制系统植入综合全电力系统的模型。通过增加软件调度层并在线确定优先级的方法,确定实时节点占用信道的顺序,克服了现场总线技术缺点的同时解决了以太网本身的实时性问题,符合电力推进船舶综合全电力系统的要求及其发展趋势。仿真结果证明了结论的有效性。Aiming at the deficiency of fieldbus application in IPNCS(Integrated Power Networked Control System),the model transplanting network control system based on real-time Ethernet Integrated Power System is developed.By using the methods of adding software scheduling layer to determine the priority online,it can determine the order of real-time take channel and overcome the bus technical weakness on the spot as well as the real time problem based on Ethernet itself.It conforms to the requirement and development trend of the integrated power system for electric propulsion vessel.The simulation result verifies the validity of the conclusion.
分 类 号:U665.12[交通运输工程—船舶及航道工程] TP273.5[交通运输工程—船舶与海洋工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.4