检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:吴林伟[1] 张建华[1] 朱星阳[1] 刘若溪[1]
机构地区:[1]华北电力大学电气与电子工程学院,北京102206
出 处:《华东电力》2012年第4期643-647,共5页East China Electric Power
基 金:国家自然科学基金项目(50877026)~~
摘 要:随着风电场规模的不断扩大,风电并网对系统可靠性的影响越来越明显。基于非序贯蒙特卡罗模拟法建立了含风电场的发输电系统可靠性评估模型,该模型考虑了风速的随机性和同一风电场内风电机组停运事件的相关性。建立了计及风电上网量的多目标优化切负荷模型,并应用于风电场接入后系统可靠性评估。以IEEE RTS-79系统为例验证了算法和模型的有效性,并分析了风电场接入后系统可靠性的影响因素。With the constant enlargement of the wind power farm scale,the influence of grid-connected wind farm on the reliability of power system became more and more pronounced.A reliability assessment model of wind power integration in power systems based on the Monte-Carlo simulation approach is presented in this paper,which considered the randomicity of the wind and the relevance of the forced outage of wind generators in the same wind farm.A multiple target load cutting model considering wind power is established and applied to evaluate the reliability of power system integrated with wind farms.The calculation of the IEEE-RTS79 test system is carried out to verify the effectiveness of the model and factors which influence the reliability of power system after wind farm grid connected are analyzed.
分 类 号:TM732[电气工程—电力系统及自动化] TM614
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:3.148.182.104