检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:刘晓平[1] 凌威[1] 林积大[1] 周俊[1] 陈亚娇[1]
机构地区:[1]长沙理工大学水利工程学院,湖南长沙410076
出 处:《中国港湾建设》2012年第2期13-14,69,共3页China Harbour Engineering
摘 要:全直桩高桩板梁式码头结构整体刚度较小,抵抗水平荷载的能力较差,为改善其不足,提出了底梁式全直桩高桩板梁码头结构型式。文中运用有限元方法,并选用非线性钢筋混凝土结构为计算模型,分别对有无底梁的全直桩高桩码头结构在水平力作用下结构的变形及内力特征进行了计算分析比较。结果表明:全直桩高桩码头结构由于设置了底梁后,结构整体刚度增大,其抗水平能力大幅度提高。Because the whole stiffness of the structure of all-vertical-piled wharf is less,the capacity for resisting the horizontal loads is poor.To improve the shortage,the all-vertical-piled and mudsill wharf structure is proposed.This paper uses finite element method and selects the nonlinearity reinforced concrete structure as a calculating model,analyzes and compares the characteristics of deformation and stress of the all-vertical-piled with or without mudsill respectively under the horizontal force.The results show that owing to the setup of mudsill in the all-vertical-piled wharf,the overall stiffness of the structure has increased;thereby,its capacity to resist horizontal loads has improved greatly.
分 类 号:U656.11[交通运输工程—港口、海岸及近海工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.117