检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:张宏宇[1] 印永华[1] 申洪[1] 梁双[1] 王皓怀[1]
出 处:《电力系统自动化》2012年第1期32-37,共6页Automation of Electric Power Systems
摘 要:在分析风电并网后系统调峰需求变化的基础上,运用可靠性理论,基于序贯蒙特卡洛方法,提出了风电并网系统调峰裕度评估方法。该方法计及常规机组的强迫停运概率和风电随机波动特性,充分利用序贯蒙特卡洛方法便于加入规则的特性,提出了调峰不足概率指标及其计算方法。利用所述方法对IEEE-RTS系统进行了调峰裕度评估,验证了该方法的可行性和有效性。A peak-shaving margin evaluation method associated with wind power integrated system is developed.It is based on the analysis of peak-shaving demand changes of wind power integrated system,and sequential Monte-Carlo method,using reliability theory.Considering unit forced outage rate and random fluctuation of wind power,the proposed method makes full use of sequential Monte-Carlo method features of easy to add rules.Peak-shaving capacity insufficient probability index and its calculation method are proposed.Peak-shaving margin evaluation of IEEE-RTS system demonstrates that the proposed method is feasible and effective.
关 键 词:风力发电 调峰裕度 序贯蒙特卡洛方法 调峰不足概率
分 类 号:TM614[电气工程—电力系统及自动化]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.70