已掘砌立井全井筒段出水治理技术  被引量:3

Technique of water inflow control of full shaft section of constructed vertical shaft

在线阅读下载全文

作  者:汪敏华[1] 丁同福[2] 

机构地区:[1]淮南矿业集团生产部,安徽淮南232001 [2]淮南矿业集团地质勘探工程处,安徽淮南232052

出  处:《煤田地质与勘探》2012年第2期67-70,74,共5页Coal Geology & Exploration

摘  要:淮南矿业集团望峰岗一副井在凿井过程中多次发生突水事故,在分析原因的基础上,结合该工程水文地质条件及现场环境条件,采用定向分支造孔方法,实行下行式、小段高、低压重复注浆方式,成功在已砌筑井壁的井筒周围形成堵水帷幕,从而解决了强含水"红层"涌水问题。该技术对于造孔过程中断层带、壁后空洞区域孔壁的稳定性及漏浆的处理具有很好的借鉴作用。On the basis of analysis of the cause of several water bursts during construction of Wangfenggang auxil- iary shaft of Huainan Mining Group Corp, in combination of the hydrogeological conditions and field environmental conditions, by adopting directional branch holes and using downward small section high and low-pressure repeated grouting, a water-blocking curtain was successfully formed around the constructed shaft, resolving the water burst problem from highly aquiferous "red layer".The method used during hole making for keeping stability of hole wall and treating leakage in the fault zone and cavity area behind the shaft has reference significance for similar engi- neering in the future.

关 键 词:掘砌 立井 全井筒段 帷幕堵水 

分 类 号:TD74[矿业工程—矿井通风与安全]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象