检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
机构地区:[1]东北电力设计院,长春130021
出 处:《吉林电力》2012年第2期1-3,24,共4页Jilin Electric Power
摘 要:在分析吉林省电力市场空间和能源资源供应形势的基础上,以EPR1700核电机组为例,从电网潮流分布、导线型号选择、稳定校验、经济性分析及系统调峰要求等多方面,对大型核电站接入吉林电网的适应性进行了分析。研究结果表明,随着吉林省负荷增长及能源短缺情况的加重,大型核电站接入吉林电网是适宜的,但考虑到吉林省自身电源、电网结构及发展,未来核电站应考虑参与系统调峰。Based on the analysis on the space and energy sources supplying situation of Jilin power market, taking EPR1700 nuclear unit as an example,the adaptability of large scale nuclear power station accessing into Jilin power grid has been analysed with the consideration of grid flow distribution, cable type selection, stablability verification, economic analysis and system peak demand etc. The research results shows that it is considerable for large scale nuclear power station to access into Jilin power grid. With the consideration of power source, power grid structure and its development, the future nuclear power station shouldbe taking part in peak regulation.
关 键 词:吉林电网 大型核电站 潮流分布 稳定计算 系统调峰 适应性
分 类 号:TM623[电气工程—电力系统及自动化] TM744.2
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:3.137.200.242