检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
机构地区:[1]江苏省交通科学研究院股份有限公司,江苏南京210017 [2]江苏省水利勘测设计研究院有限公司,江苏扬州225009
出 处:《水运工程》2012年第4期166-170,共5页Port & Waterway Engineering
摘 要:在结构设计中,当地基承载能力不足时,往往会采用预制或灌注桩进行地基处理。对全直桩基础结构,影响桩水平承载能力的因素是多方面的,结合算例对各影响因素及其权重进行分析,并对桩顶不同连接形式的特点及适用条件作了阐述,以期对今后的全直桩基础设计起到一定的借鉴作用。For a structure, if the bearing capacity of the foundation is insufficient, precast or casting piles are generally used. For the foundation consisting of whole vertical piles, the horizontal bearing capacity of the pile is influenced by many factors. Based on the analysis of the results of an example, this paper gives a list of the influential factors and corresponding weight to the horizontal bearing capacity. Furthermore, the characteristics of different connection modes of pile tops and relevant applying circumstances are also given, hoping to serve as a reference for the design of whole vertical-pile foundation.
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.244