柳南客运专线铁路四电工程接口施工监理  

Construction Supervision Practice in the Engineering Interfaces of C&S System,Electrification System,Power System,and Information System of Liuzhou-Nanning PDL

在线阅读下载全文

作  者:黄世勋 

机构地区:[1]柳州铁路建设监理公司

出  处:《铁道通信信号》2012年第4期77-79,共3页Railway Signalling & Communication

摘  要:针对柳南客运专线铁路四电工程接口,从四电工程接口监理实践出发,对接口工程施工监理提前介入,强化过程控制,实施"1+2监控、验收"模式等,为提高四电工程接口现场管控能力,确保工程有序推进奠定了基础。As for the engineering interfaces of CS system,electrification system,power system,and information system of Liuzhou-Nanning PDL,it is recommended that construction supervision over the interface engineering be conducted in advance to strengthen process control based on engineering supervision practices.The implementation of 1+2 monitoring and acceptance mode can improve the ability of field control over interface engineering and lay a foundation for ensuring the orderly progress of the projects laid the Foundation for pushing.

关 键 词:客运专线 工程接口 施工监理 

分 类 号:U282.3[交通运输工程—交通信息工程及控制]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象