杨柳青电厂6号单元机组磨煤机控制系统改造升级  被引量:1

The Development and Promotion of Coal Mill Control System of #6 Unit of Yangliuqing Power Plant

在线阅读下载全文

作  者:郑伟[1] 张伟伟[1] 

机构地区:[1]天津华能杨柳青热电有限责任公司,天津300380

出  处:《机电工程技术》2012年第4期99-102,共4页Mechanical & Electrical Engineering Technology

摘  要:华能杨柳青电厂6号300MW单元机组磨煤机控制系统已投运十余年之久,控制系统软硬件逐渐老化,故障率增高,而且原磨煤机控制系统响应速度慢,监控操作不便捷。针对这些问题,对磨煤机的PLC控制系统、工艺流程、控制逻辑以及现场设备进行升级改造,改造后的投运实际结果表明,磨煤机控制系统运行稳定,且完全达到了预期的改造升级效果。Coal mill control system of #6 unit of Huaneng Yangliuqing Power Plant has been put into operation for over ten years,the softwares and hardwares of the control system are getting older and older,and faults occur very frequent.Moreover,the old control system responds slowly and is not convenient to be operated.Face to these problems,it is necessary to upgrade the PLC control system,to change the technological process,to optimize the control logic and to renew the devices.After the development,the coal mill control system operates steadily,and completely accords with the expectant result.

关 键 词:电厂 磨煤机 控制系统 PLC 

分 类 号:TM621.6[电气工程—电力系统及自动化]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象