检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
机构地区:[1]广东电网公司电力科学研究院,广州市510600
出 处:《电力建设》2012年第5期64-66,共3页Electric Power Construction
摘 要:目前分散控制系统(distributed control system,DCS)在电厂的过程控制中发挥着举足轻重的作用,但也出现了一些问题,如何测试DCS的性能越来越受到关注。从实际应用的角度系统地阐述了DCS性能测试的体系,并给出了模拟量实时性测试、控制器处理周期测试、通道抗干扰测试等关键项目的具体测试方法和实际测试结果。此方法已在数10台机组中成功应用,其经验对在现场开展DCS性能测试具有借鉴意义。At present, distributed control system (DCS) plays important roles in power plant, but still has some problems. So the performance test for DCS is attracting more and more attention. This paper introduced the performance test technique for DCS in terms of application. Some test techniques and results were presented, such as analog signal's real time test performance test, controller's processing period test, and channel anti-jamming's function test. These test techniques have been successfully applied in ten units, which test results are especially useful for the on-site DCS's performance tests.
关 键 词:分散控制系统 实时性 性能测试 抗干扰 运算周期
分 类 号:TM62[电气工程—电力系统及自动化] TP273[自动化与计算机技术—检测技术与自动化装置]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:18.191.187.74