检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
机构地区:[1]黑龙江省工程咨询评审中心,哈尔滨150008 [2]东北林业大学土木工程学院,哈尔滨150040
出 处:《森林工程》2012年第2期75-78,共4页Forest Engineering
基 金:黑龙江省交通运输厅重点项目(2009009)
摘 要:在旧路加宽改造过程中,新旧路基结合部容易产生较大的差异变形,导致路面结构的破坏,并降低路堤的稳定性。为了减小结合部的工后差异沉降,运用PLAXIS有限元软件对旧路加宽施工过程中台阶的开挖方案进行数值模拟分析,计算各种开挖方案下新旧路基的差异沉降,提出合理的施工方案。计算结果表明:卸载及加载量越大,新、旧路基在结合部的横向和竖向差异变形也越大,旧路加宽改造时优先选用方式2和方式4这两种台阶开挖方式。In the course of old road reform and widen, the junction between old and new subgrade prones to large differences in deformation, which may lead to the destruction of the pavement structure and stability reducing of the embankment. In order to reduce the differential settlement of the junction after the construction process, finite element software PLAXIS was used to simulate and ana- lyze the schemes of excavation about steps during the construction process of old road widening. The different settlements between old and new embankment under all kinds of excavation schemes were calculated, and a reasonable construction scheme was proposed. The calculated results show that, with the greater of unload!ng and loading amount, the different deformations at the junction in both horizontal and vertical directions will be greater. Scheme 2 and 4 should be used in priority in the course of reforming and widening the old road.
分 类 号:S758.7[农业科学—森林经理学] U416.1[农业科学—林学]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.249