糯扎渡电站地下工程工期调整索赔分类及依据的探讨  

Discussion on Classification and Basis of Claims for Adjustment of Construction Period of Underground Engineering of Nuozhadu Hydropower

在线阅读下载全文

作  者:薛晓华 赵剑光 

机构地区:[1]中国水利水电第三工程局有限公司,西安710016

出  处:《价值工程》2012年第15期88-88,共1页Value Engineering

摘  要:针对施工中工期调整索赔分类及依据,通过对实践中工期调整索赔分类及依据的具体案例,结合地下工程工期调整索赔的特点,对工期索赔分类及依据充分、程序合规总结,以求达到提高工期调整索赔获得率。According to the classification and basis of claims for adjustment of construction period,through the specific case in practice,combined with the features of claims for adjustment of construction period of underground engineering,the classification and full basis of claims for construction period,as well as procedural compliance are summarized,so as to improve the obtained rate of claims for adjustment of construction period.

关 键 词:地下工程 工期调整 索赔分类 索赔依据 

分 类 号:TV51[水利工程—水利水电工程]

 