检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
机构地区:[1]华北水利水电学院水利学院,河南郑州450011 [2]河海大学水利水电学院,江苏南京210098
出 处:《水电能源科学》2012年第5期87-89,共3页Water Resources and Power
摘 要:基于《水利水电工程标准施工招标文件》(2009年版)通用合同条款影响承包商投标决策风险因素,并结合长期的经验积累,构建了水利水电工程投标决策评价指标体系,提出了一种基于直觉模糊集理论的理想解法(TOPSIS)的多项目投标决策方法,并将其应用于葛洲坝集团施工企业拟投标的A、B、C三个项目中。结果表明,B项目为优先考虑的投标项目,与实际情况相符。Based on the risk factors influencing contractor bidding decision-making in general contract terms of water conservancy and hydropower engineering construction standard bidding documents (2009), this paper establishes bidding decision-making evaluation index system of water resources and hydropower project by combining with long-term accumu- lated experience. And then it put forward a multi-projects bidding decisionmaking methodology for contractors based on intuitive fuzzy set theory and TOPSIS comprehensive ordering model. Finally, this methodology is applied to three bidding projects (A, B and C) of Gezhouba Group Corporation. The results show that the project B is chosen to be the priority bidding project, and it is consistent with the actual case.
关 键 词:直觉模糊集理论 TOPSIS法 投标决策 最优权重
分 类 号:TV9[水利工程—水利水电工程] F282[经济管理—国民经济]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.173