检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:朱寅春[1]
机构地区:[1]上海市政工程设计研究总院<集团>有限公司,上海200092
出 处:《中国给水排水》2012年第10期26-28,共3页China Water & Wastewater
摘 要:对管网平差的工作经验进行了总结,介绍了提高工作效率的几种方法(如软件应用、水源点的设置等),从管网基础资料的收集、水量分配与时变化系数的选择、管道及阀门摩阻系数的选择、校核参数之间的误差补偿、延时水力模拟与水龄计算等方面,对影响管网平差计算准确度的因素进行分析,并提出了相应的解决方法。The work experience of pipe network adjustment was summarized. Several methods to improve the work efficiency, such as software application, setting of water source and so on were introduced. The factors influencing the accuracy of pipe network adjustment were analyzed in terms of collection of pipe network data, selection of water distribution coefficient and hourly variation coefficient, selection of specific friction coefficient of pipe and valve, error compensation between calibration parameters, extended hydraulic simulation and water age calculation. The corresponding solutions were put forward.
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.222