垃圾焚烧发电厂垃圾渗滤液处理工程实例  被引量:14

Landfill Leachate Treatment Project in Refuse Incineration Power Plant

在线阅读下载全文

作  者:肖诚斌 庞保蕾 任艳双 温馨 高用贵 高兴斋 

机构地区:[1]光大环保科技发展<北京>有限公司,北京100095 [2]光大环保工程技术<深圳>有限公司,广东深圳518040

出  处:《中国给水排水》2012年第10期77-79,共3页China Water & Wastewater

摘  要:介绍了镇江垃圾焚烧发电厂渗滤液处理工程的概况,详细介绍了处理工艺流程、构筑物设计参数及调试方案。调试结果表明,该渗滤液处理工程可全量处理电厂产生的渗滤液,出水水质可达到《污水综合排放标准(》GB 8978—1996)的三级标准,对其COD、氨氮的去除率分别可达98.99%和99.43%。系统运行稳定,直接运行成本低,不产生二次污染。An introduction was made about the general situation of leachate treatment project in Zhenjiang Refuse Incineration Power Plant. The process flow, design parameters of structures and commissioning plan were described. The commissioning results showed that this project was capable to treat the full amount of the leachate generated from the power plant, the effluent quality met the third class cri- teria specified in the Discharge Standard of Integrated Wastewater (GB 8978 -1996), and the removal rates of COD and NH3 - N were 98.99% and 99.43% respectively. The system ran steadily with low treatment cost and no secondary pollution.

关 键 词:垃圾渗滤液 调试 复合式厌氧反应器 

分 类 号:X703[环境科学与工程—环境工程]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象