检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:黎运棻[1]
机构地区:[1]水利部山西水利水电勘测设计研究院,山西太原030024
出 处:《山西水利科技》2012年第2期1-4,16,共5页Shanxi Hydrotechnics
摘 要:从防止饱和松散粉细砂地基的地震液化出发,研究振冲碎石桩的桩距计算,据振冲桩施工中出现的加固变形和非加固变形新概念,从空间变形条件给出桩距计算的方法。由地基勘察和试桩中测定有关参数,以及引入砂土相对紧密度与孔隙比、标准贯入击数间的关系,使计算方法便于工程设计应用,也提高了计算成果可信度,并以工程实例说明有关测试和计算步骤。In this paper the computation of the pile spacing of vibro-macadam pile is studied in order to prevent the foundation liquefaction of saturated loose silt-fine sand and caused by the seismic shock.The calculation method of pile spacing is obtained according to the new concept of "strengthened deformation" and "non-strengthened deformation" appearing in the engineering and condition of the space deformations,and is easily applied to practical design by using relevant parameters determined in foundation survey and pile test and by introducing the relation between the relative density of silt-fine sand and void ratio,N-value of the standard penetration test(SPT).In this paper an engineering example is calculated and the computation steps are explained.According to the practice a few conclusions are obtained.
分 类 号:TV222[水利工程—水工结构工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.112