某隧洞用掘进机(TBM)施工中的工程监理控制  

Engineering Supervision Control of Constructing a Tunnel by TBM

在线阅读下载全文

作  者:高文先[1] 

机构地区:[1]山西黄河水利工程咨询有限公司,山西太原030012

出  处:《山西水利科技》2012年第2期56-58,61,共4页Shanxi Hydrotechnics

摘  要:我国西部某隧洞工程采用TBM施工,设计断面为圆形,六边形预制钢筋混凝土管片衬砌,衬砌后内径为6.0m,洞段长度23.7 km,历时4年零2个月。文中详细论述了隧洞开挖过程,管片安装过程,豆砾石回填灌浆过程中及不良地质洞段施中的工程质量监理控制。In a tunnel project which is located in the west of our country,the TBM technique was used to construct its tunnel.Its design cross section is circle type,the lining is composed with reinforced concrete hexagonal segments.Its diameter after lining is 6 m,the length of tunnel is 23.7 m.To complete this project lasted for 4 years and 2 months.The paper expounds all of the engineering supervision control jobs in the entire construction processes including tunnel excavation process,segment installation process,pea gravel filling grouting process and constructing process in the tunnel reach having bad geologic condition.

关 键 词:全段面隧洞掘进机 质量 控制 监理 

分 类 号:TV523[水利工程—水利水电工程]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象