检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
机构地区:[1]中国水电顾问集团贵阳勘测设计研究院,贵州贵阳550081 [2]河北工程大学水电学院,河北邯郸056038
出 处:《中国水能及电气化》2012年第5期46-49,共4页China Water Power & Electrification
摘 要:确定一个合适的水轮机额定工作水头,对于保障水轮发电机组的稳定运行和提高水电站运行的经济效益是至关重要的。以立州水电站水轮机选型设计为例,通过对不同额定水头方案水轮机的加权平均效率、投资、运行可靠性等的分析和比较,阐述了确定水轮机额定水头时应考虑的主要因素和优选方法。The determination of a suitable turbine rated operating head is essential for ensuring stable operation of hydroelectric generating set and improving the economic benefits of hydropower station running. Lizhou Hydropower Station Turbine Selection and Design was taken as example, the weighted average efficiency, investment, operational reliability, etc. of different rated water head scheme turbines were analyzed and compared to describe the main factors and optimal methods which should be considered during determin/ng the rated water head of turbines.
分 类 号:TV734.1[水利工程—水利水电工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.120