检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:王晓东[1,2]
机构地区:[1]太原理工大学矿业工程学院,山西太原030024 [2]煤炭工业太原设计研究院,山西太原030001
出 处:《科技情报开发与经济》2012年第9期159-160,共2页Sci-Tech Information Development & Economy
摘 要:对玉华矿矿井采区布置方法进行了探讨,得出结论:该矿矿井首采区为1、2号煤层一采区,矿井生产能力为0.913Mt/a,可满足矿井0.9Mt/a设计生产能力的要求;一采区东西长1.99km,南北长1.58km,采区面积约3.15km2,为单翼开采采区,采用伪倾向长壁开采。This paper probes into the methods for the mining area layout in Yuhua Coal Mine, and draws the conclusion that the first mining area in Yuhua Coal Mine is No. 1 mining area of the first coal seam and second coal seam, and the mine's production capacity is 0.913 Mt/a, which can meet the requirement of 0.9 Mt/a design production capacity, and No.1 mining area's east-west length is 1.99 kin, the north-south length is 1.58 km, mining area with single wing is about 3.15 km2, and the false tendency long-wall mining is adopted.
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.229