检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
机构地区:[1]内蒙古电力科学研究院,内蒙古呼和浩特010020 [2]内蒙古电力(集团)有限责任公司,内蒙古呼和浩特010020 [3]内蒙古呼和浩特供电局,内蒙古呼和浩特010050
出 处:《内蒙古电力技术》2012年第2期104-107,共4页Inner Mongolia Electric Power
摘 要:分析了内蒙古呼和浩特市供电及输变电设备运行可靠性现状,认为存在外力破坏导致跳闸次数大幅增多的问题,而设备、气候、用户等因素对线路安全运行也造成了严重影响。针对以上原因,提出了加强供电可靠性管理体系建设、制定有效的供电可靠性管理措施以及采用先进技术和设备等建议,以保证供电的可靠性和电力系统的安全运行。Status quo on reliability of power supply and power transmission equipment operating in Hohhot Region, Inner Mongolia has been analyzed. It is acknowledged that significant influences to power line safety operation have been existed owing to sharp increment of trips caused by external destruction, and factors of equipment, climate, and users. Countermeasures have been put forward to solve problems mentioned above, such as strengthening construction on reliability of power supply management system, developing effective supply reliability management measures, and utilizing advanced technology and equipments to ensure power supply reliability and safe run of power system.
分 类 号:TM72[电气工程—电力系统及自动化]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.117