检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:嵇康东[1] 杨文军[1] 章亮[1] 朱继华 何辉
机构地区:[1]中国建筑第八工程局有限公司广州分公司,广东广州510665 [2]中建钢构有限公司,广东深圳518040
出 处:《施工技术》2012年第5期15-19,共5页Construction Technology
基 金:中国建筑第八工程局有限公司科研项目(CSCEC8B-2010-09)
摘 要:东莞篮球中心主体育馆钢结构屋架为车辐式马鞍形空间结构,钢屋架28个带抗剪键箱形支座安装精度高,钢桁架单向斜拉杆张拉难度大,铸钢节点、锻造件节点、复杂三维弯扭制作及现场安装难度大。根据结构特点,重点介绍钢内环临时胎架支撑,地面散件拼装及高空定位总拼的吊装方法;主桁架+GZ2馆外600t履带式起重机一次安装到位;斜拉杆从内往外沿径向分级张拉。另外,指出采用砂漏同步分级思路,循环依次卸载方法。The main stadium of Dongguan Basketball Center has wheel saddle-shape spatial steel roof.The roof has 28 box supports with shear connector which has higher installation precision.In roof's installation,some installation technologies are difficult such as tensioning of inclined pull-rod of steel truss and prefabrication and on-site installation of some joints and complex bending-torsion members.Based on structure's characteristics,the authors mainly introduce installation scheme of inner steel ring supported by temporary jigs,members assembled one by one on ground,and total assembled in high-sky,installation method of the main truss and GZ2 column installed in place outside the stadium by 600t crawler crane and tensioning method of the inclined pull-rods by grade from inner to outer.The authors also introduce circle unloading method synchronous with sand-box.
分 类 号:TU758.11[建筑科学—建筑技术科学]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.3