检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
机构地区:[1]长沙理工大学土木与建筑学院,湖南长沙410004 [2]湖南省吉茶高速公路建设开发有限公司,湖南吉首416000
出 处:《公路工程》2012年第2期37-40,共4页Highway Engineering
摘 要:刚构—连续组合梁桥需经历墩梁临时固结拆除的体系转换过程,该种桥型属于超静定体系,临时固结的拆除会对桥梁结构成桥后位移和应力产生影响。探索该桥临时固结的拆除顺序对结构的影响,以达到优化合龙方案的目的,为今后该类桥梁的临时固结拆除方案提供相应的参考。Rigid Frame-continuous composite girder bridge requirement a process that temporary consolidation of the pier beam removal of system transformation,this bridge belong to a statically indeterminate system,the removal of temporary consolidation will impact for the bridged's displacement and stress of bridge structure.Explore the impact of the bridge's temporary removal of the consolidation order on the structure,in order to achieve the purpose of optimizing the closure program,and to provide the appropriate reference for the temporary consolidation of such bridges in the future dismantling program.
关 键 词:刚构—连续组合梁桥 超静定体系 临时固结拆除 次内力
分 类 号:U448.215[建筑科学—桥梁与隧道工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.117