刚构—连续组合梁桥临时固结拆除顺序的研究  被引量:11

The Removal Order Research for Structure-temporary Consolidation of the Rigid Frame-Continuous Girders

在线阅读下载全文

作  者:曾振华[1] 习安 李昭廷 

机构地区:[1]长沙理工大学土木与建筑学院,湖南长沙410004 [2]湖南省吉茶高速公路建设开发有限公司,湖南吉首416000

出  处:《公路工程》2012年第2期37-40,共4页Highway Engineering

摘  要:刚构—连续组合梁桥需经历墩梁临时固结拆除的体系转换过程,该种桥型属于超静定体系,临时固结的拆除会对桥梁结构成桥后位移和应力产生影响。探索该桥临时固结的拆除顺序对结构的影响,以达到优化合龙方案的目的,为今后该类桥梁的临时固结拆除方案提供相应的参考。Rigid Frame-continuous composite girder bridge requirement a process that temporary consolidation of the pier beam removal of system transformation,this bridge belong to a statically indeterminate system,the removal of temporary consolidation will impact for the bridged's displacement and stress of bridge structure.Explore the impact of the bridge's temporary removal of the consolidation order on the structure,in order to achieve the purpose of optimizing the closure program,and to provide the appropriate reference for the temporary consolidation of such bridges in the future dismantling program.

关 键 词:刚构—连续组合梁桥 超静定体系 临时固结拆除 次内力 

分 类 号:U448.215[建筑科学—桥梁与隧道工程]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象