检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
出 处:《工业建筑》2012年第5期115-118,114,共5页Industrial Construction
摘 要:多方位立体双向搅拌桩(MMP桩)是一种改进的水泥搅拌桩地基处理方法。为了研究该工法成桩过程中既有线路地基超孔隙水压力变化,使用有限元软件ABAQUS,建立三维有限元模型,采用Biot固结理论和修正剑桥模型以及现场土性参数试验值,模拟上海近郊某铁路路基加固工程中MMP桩成桩过程,计算得到了成桩过程的超孔压的增长及消散情况以及侧向土压力变化情况。将数值模拟结果与现场实测结果对比,两者变化趋势基本一致,吻合得比较好。MMP pile is an improved method of deep mixing cement-soil columns, and driving pile affects the surrounding soil of the pile. By using the finite element software ABAQUS, the process of MMP pile driven at a site near a railway foundation in Shanghai was simulated based on the theory of Biot consolidation and modified Cam-Clay constitutive model. The changes in the excess pore pressure and the lateral earth pressure were obtained. Comparison of computed and measured results in situ showed that the computed excess pore water pressure and lateral earth pressure were consistency with those measured from in situ.
关 键 词:多方位立体双向搅拌桩 湿喷法 修正剑桥模型 超孔隙水压 侧向土压力
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.15