检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:刘世奇[1] 桑树勋[1] 李仰民[2] 李梦溪[2] 刘会虎[1] 张建国[2]
机构地区:[1]中国矿业大学资源与地球科学学院煤层气资源与成藏过程教育部重点实验室,江苏徐州221116 [2]华北油田公司山西煤层气分公司,山西晋城048000
出 处:《煤炭科学技术》2012年第6期108-112,共5页Coal Science and Technology
基 金:国家高技术研究发展计划(863计划)资助项目(2007AA06Z220)
摘 要:依据煤层气井压裂施工的工艺参数,以沁水盆地南部12口煤层气井压裂施工失败为例,分析了沁水盆地南部煤层气井压裂失败的主要控制因素,研究认为:井口刺漏、高压停泵和煤储层力学性质是沁水盆地南部煤层气井压裂施工失败的主要控制因素;井口刺漏主要是由施工压力过高、井口老化造成的;高压停泵主要是由砂堵引起的,井口刺漏、高压停泵与砂堵之间相互影响及促进;砂堵受施工工艺及地质因素的影响;研究区煤储层具有低弹性模量、高泊松比的特点,地层开启难度大且裂缝难以延伸;压裂施工前,应做好煤储层特征的研究、压裂设备的选择、压裂工艺的设计等,减少工程事故的发生。Taking the technical parameters of the fracturing operations in the coal bed methane well as the basis and taking the fracturing failures of the 12 coal bed methane wells in south part of Qinshui Basin as an example, the paper analyzed the main control factors of the fracturing failures of the coal bed methane wells in south part of Qinshui Basin. The study held that the tabbing leakage of mine shaft head, the stop of the high pressure pump and the mechanics property of the coal seam would be the main control factors of the fracturing failure in the coal bed methane wells of the south part of Qinshi Basin. The stabbing leakage of the mine shaft head was caused by the con- struction pressure too high and the aging of the mine shaft head. The stop of the high pressure was mainly caused by the sand jammed. There were mutual influences and promotion between the stabbing leakage of the mine shaft head, the stop of the high pressure pump and the sand jammed. The sand jammed would be affected by the construction technology and the geological factors. The coal seams in the study area would have the features of the low elastic modules and high Poisson's ratio. The strata would have high difficult in excavation and the crack would be difficult to be expanded. Before the fracturing construction, the study on the coal seam features, the selection of the fracturing equipment and the design of the fracturing technology should be well done to reduce the project accident occurred.
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.46