机构地区:[1]甘肃省电力公司兰州输变电运行公司,兰州730000 [2]长沙理工大学电气与信息工程学院,长沙410004
出 处:《电气技术》2012年第5期41-44,共4页Electrical Engineering
摘 要:GIS组合电器已广泛应用于电力系统,为了能更好的解决GIS设备的长距离母线在运行后水平位移与垂直位移问题,现场采用的方法是增加伸缩节和水平滑块。本文总结750kV兰州东变电站3年多的运行经验,分析了伸缩节和水平滑块的应用效果,并提出利用主刚固定支架、伸缩节、滑块支架与次刚固定支架配合的方法来解决长母线筒端部位移问题,最后给出了伸缩节位移的模型,并与实际数据对比分析。Gas Insulated Substation(GIS) has been widely used in power systems.In order to resolve the question of horizontal displacement and vertical displacement after the long-distance bus operating,there is the way that adds to expansion joints and sliding supports.Summarizing the 3 years experience of 750kV Lanzhou Dong Substation,this article proposes the application of expansion joints and sliding supports.The paper presents the conclusion that using the main-stationary support,the sliding support,expansion joints and the second-stationary support to solve the displacement of long-distance bus enclosure.Finally,it gives the model of expansion joint-displacement,and compares with the actual value.
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.117