检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
机构地区:[1]上海电力学院电力工程与自动化学院,上海200091
出 处:《中国电力》2012年第4期23-28,共6页Electric Power
基 金:上海市教委重点学科建设项目资助(J51303)
摘 要:配电网规划方案的综合决策过程不可避免地会受到主观意识左右,从而影响决策结果的可靠性,因此尽量降低主观因素对配电网规划方案综合决策的影响对指导电网的合理建设和改造具有重要意义。基于层次分析法引入群决策理论,通过对各决策组成员意见进行一致性分析,合理反馈,以得到各成员动态权重,进而形成客观的、具有代表性的聚合决策意见,为最终的方案排序提供了依据,增强了决策过程的客观公正性,提高了决策结果精度和可靠度。实例计算表明了该方法的正确性,且简洁易实现,具有较好的现实意义。The process of comprehensive decision making of distribution network planning is inevitably affected by subjective cnnsciousness, which would reduce the reliability of decision. So minimizing the impact of subjective deviation on decision making as much as possible is important to reasonable grid construction and reformation. In this paper, group decision making based on AHP (GAHP) is introduced, which can realize consistency analysis of each decision group members" opinion and work out the dynamic weight of each members, and then torm an objective, representative aggregation opinion. It provides a new method for the final program sorting. GAHP could enhance the objectivity and fairness as well as improve the accuracy and reliability of the results of decision making. The example shows the correctness and simplicity of the proposed GAHP.
分 类 号:TM715[电气工程—电力系统及自动化]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.117