检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:蒲倩[1] 张毅威[1] 陆秋瑜[1] 胡伟[1] 陈磊[1] 李健[2] 周剑[2] 庞晓艳[2]
机构地区:[1]清华大学电机系电力系统国家重点实验室,北京100084 [2]四川省电力公司,四川成都610041
出 处:《中国电力》2012年第2期5-8,共4页Electric Power
摘 要:水电群通过长距离超高压通道送电,大扰动后与电网解列而形成水电群孤网,孤网可能产生高压现象。基于四川茂县水电群的实际情况,对孤网高压问题进行研究,分析其主要成因,讨论利用发电机进相运行能力解决问题的可行性,提出了通过发电机励磁控制的方法,充分而合理地利用发电机进相能力,安全、有效地控制水电群孤网电压。After a large disturbance, the hydropower group connected to main system through a long distance and extra-high voltage power line may split from the system and turn into isolated operation. Over-voltage phenomenon may occur in the isolated network. Based on the actual case of Maoxian hydropower group in Siehuan province, the problem of over-voltage control in the isolated network is studied. The major causes of over-voltage are analyzed and the feasibility of over-vohage suppression by generator leading phase operation is discussed. Methods to adequately and reasonably utilize generator' s leading phase operation capability through excitation control of generator are proposed to control isolated system voltage safely and effectively.
分 类 号:TM761[电气工程—电力系统及自动化]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.222