大跨预应力混凝土箱梁桥施工期腹板开裂研究  被引量:16

Study on Early Crack in the Web of Long-span PC Box Girder Bridge

在线阅读下载全文

作  者:汪建群[1] 方志[1] 

机构地区:[1]湖南大学土木工程学院,湖南长沙410082

出  处:《湖南大学学报(自然科学版)》2012年第5期1-7,共7页Journal of Hunan University:Natural Sciences

基  金:交通部长湘高速公路两型科技示范工程科研计划项目

摘  要:为探求一座大跨预应力混凝土箱梁桥施工早期腹板开裂原因,在实桥上进行了水化热测试.基于施工现场同条件养护混凝土早龄期力学性能发展规律的实测结果,应用有限元方法按照实际施工过程建立时变模型,对箱梁混凝土水化热所致的温度场和应力场进行分析,并对预应力张拉进行了模拟.结果表明:水化热计算结果与实测值吻合良好,过高的水化热是引起该桥箱梁腹板早期开裂的主要原因之一,而预应力张拉时结构应力处于较低的水平.The hydration heat was tested to investigate the early crack in the web of a long-span PC box girder bridge. Based on the mechanical properties of specimens cured at the construction site, the tempera- ture and stress fields were simulated in time varying model by finite element method. The prestress tension was analyzed with construction stage considered as well. The results demonstrated that the calculated re- sults of hydration heat agreed well with the measured ones. The hydration heat is one of the main reasons for the early cracks in the web of box girder, while the stress of the concrete box girder is at a very low level during prestress tension.

关 键 词:预应力混凝土箱梁桥 早期裂缝 水化热 力学性能 有限元方法 

分 类 号:U446.1[建筑科学—桥梁与隧道工程]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象