检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
机构地区:[1]北京交通大学土建学院,北京100044 [2]中建钢构有限公司,广东深圳518040
出 处:《工程力学》2012年第A01期63-67,共5页Engineering Mechanics
基 金:国家自然科学基金项目(51078018)
摘 要:该文收集近年模板支架坍塌事故原因,提出20种人为过失,选取30个以高大模板支架为主的工程,对其在搭设和混凝土浇注期出现的人为过失进行现场调查,通过数据分析给出人为过失的发生规律,对一些发生概率较大的人为过失如扭紧力矩不足、立杆壁厚不足和立杆超出顶层水平杆长度过大等进行了测量和统计分析,分析典型人为过失对结构承载力的影响,计算了带有多个人为过失的模板支架的可靠度,并分析了人为过失对结构可靠度的影响。Based on the causes of high falsework collapses in recent years, 20 kinds of human errors are presented. In-situ investigations of human errors were made during the periods of falsework assembling and concrete placement. The occurrence of human errors are given and some human errors with high occurrence possibility on thickness of a tube, the length of a vertical tube above the top of a horizontal tube and the tightening torque of a bolt were surveyed and analyzed statistically. The influences of some typical human errors on ultimate capacity are presented. The reliability of a falsework with multiple human errors is calculated and the influences on structural reliability are analyzed.
关 键 词:高大模板支架 人为过失 发生规律 结构可靠性 调查分析
分 类 号:TU201[建筑科学—建筑设计及理论]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.3