检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
机构地区:[1]长江三峡勘测研究院有限公司(武汉),湖北武汉430074
出 处:《水电与新能源》2012年第3期51-53,共3页Hydropower and New Energy
摘 要:通过野外地质调查与钻探等手段,查明了金沙江某水电站弃渣场的地质条件,重点分析了弃渣场的稳定性,泥石流对弃渣场的影响两个工程地质问题。结果表明:渣场基本沿两条相邻的较大的东西向沟谷堆填,地形条件较好,基本适宜作为渣场,但渣场地表全强风化岩体厚度较大,需对弃渣体的抗滑稳定性进行校核。The geological conditions of the abandoned dreg field of a hydropower station in Jinsha River are ascertained through some approaches such as field geological survey and drilling. Two main geological problems, the stability of the abandoned dreg field and the mudslide influence to the abandoned dreg field, are analyzed. The results indicate that the field with fairly good topography, which is filled along two adjacent east-west gullies, fits the basic requirements of an a- bandoned dreg field. The sliding resistance stability of the abandoned dreg should be checked further due to the relative- ly great thickness of the strong-weathered rock mass surface.
分 类 号:TV523[水利工程—水利水电工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.42