山西省引黄主输水系统数学模型及仿真结果分析  

Computer Simulation of Main Transient Control of the Wanjiazhai Diversion System

在线阅读下载全文

作  者:吴建华[1] 郝新平 贾锦霞[3] 张一新[4] 

机构地区:[1]太原理工大学,太原030024 [2]山西省公路局,太原030024 [3]山西省遥感中心办公室,太原030024 [4]水利部山西水利水电勘测设计研究院,太原030024

出  处:《系统仿真学报》2000年第3期222-225,共4页Journal of System Simulation

摘  要:引黄工程是解决山西省水源不足的大型供水工程 ,其流量大、管道长、扬程高、级间串联、泵站内多台机组并联的复杂泵系统在国内外是罕见的。本文对其总干水系统调节控制计算机仿真 ,以期为工程设计及运行管理提供技术依据。The Wanjiazhai Diversion Project for drawing water from Yellow River to Shanxi is carried out for solving the problem of water shortage in Shanxi Province. It is a macro scale complex pumping system with huge discharge, huge head and long pipeline and with a great number of parallel pumps. It is not only the biggest one in China at present, but also seldom in the world. The paper introduces the simulation of the main transient control system for providing reliable reference to the project design and management.

关 键 词:计算机仿真 水系统 引黄工程 数学模型 山西 

分 类 号:TV67[水利工程—水利水电工程] TP391.9[自动化与计算机技术—计算机应用技术]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象