检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
机构地区:[1]上海电力设计院有限公司,上海200025 [2]上海市电力公司检修公司,上海200072 [3]上海市电力公司电力经济技术研究院,上海200082
出 处:《华东电力》2012年第5期873-877,共5页East China Electric Power
摘 要:随着城区负荷密度的提高和用电量的急增,目前呈现高压变电站深入负荷中心供电的趋势,但出于市容建设等各方面的要求,架空线走廊日益紧张,新增高压供电线路基本以电缆为主。基于架空线和电缆线路的不同特性,对不同电压等级变电站的主接线和电网供电方式进行分析,研究了架空线电缆化对网络结构和变电站主接线产生的影响,对不同供电方案进行比较,为高压电缆线路给城市电网的供电模式带来的影响提出对策。With the increase of power load density and electricity consumption in urban areas, HV substations have developed for power supply in load center. However, the corridor of overhead lines is becoming more difficult to obtain due to city construction requirements. So the high voltage cables are now widely used in the urban power supple network. Based on the different characteristics of cable and overhead line, this paper analyzes the main connection and power supply mode of different substations, as well as the impact of cabling reconstruction of overhead line on network structure and substation main connection. Finally, various power supply modes are compared, and some countermeasures are proposed for the impact of HV cable line on the urban power supply mode.
关 键 词:城市电网 变电站主接线 大截面高压电缆 供电模式
分 类 号:TM63[电气工程—电力系统及自动化]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.13