170t/h干熄炉壳体设计计算  

Design and calculation of the 170t/h CDQ furnace shell

在线阅读下载全文

作  者:徐升[1] 荣金方 郭起营[1] 李晓红[1] 

机构地区:[1]济钢集团国际工程技术有限公司,山东济南250101

出  处:《中国科技纵横》2012年第12期73-74,共2页China Science & Technology Overview

摘  要:为进一步发展节能技术,国家鼓励焦炭生产企业推广应用干熄焦技术,建设大型化、超大型化干熄焦装置。干熄焦装置处理能力的变化对于焦炭冷却质量影响很大,如果干熄炉的砌筑结构和壳体控制不好可能会导致焦炭无法冷却等缺陷。故有必要对其干熄炉壳体的结构进行技术检验与校核,使得冷却后焦炭的质量和产量能够满足生产及客户的要求。In order to further develop energy-saving technology, our state encourages enterprises of coke production to employ the technology of coke dry quenching (CDQ) and build the large-scale equipment of coke dry quenching. It makes a great impact on the quality of coke cooling by the change of CDQ capacity. The poor control of CDQ furnace shell and masonry structures may result in defects such as coke can not be cool. Therefore, it is necessary to inspect and verify its CDQ furnace shell structure, making the quality and yield of cooling coke meet production and customers ' requirement.

关 键 词:干熄焦 砌筑结构 壳体壁厚 腐蚀裕量 

分 类 号:TQ522.16[化学工程—煤化学工程]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象