长距离重力流压力输水工程水锤防护设计探讨  被引量:12

Discussion on Design for Water Hammer Prevention in Long Distance Water Conveyance with Gravity and Pressure

在线阅读下载全文

作  者:赵小利[1,2] 高双强 吴钊 李文奇[2] 

机构地区:[1]西安水利规划勘测设计院,陕西西安710054 [2]中国水利水电科学研究院,北京100038

出  处:《水利与建筑工程学报》2012年第3期88-91,共4页Journal of Water Resources and Architectural Engineering

摘  要:随着城市用水规模不断扩大,长距离输水工程日益增多,水锤引起的爆管严重影响了长距离压力输水工程安全。为解决李家河水库输水工程因管线长、地面起伏大而发生水锤破坏可能性的问题,进行管道分段、阀门选择、运行控制等多种措施综合设计,并采用特征线法进行数值模拟计算,有效保障压力输水工程安全。提出长距离重力流压力输水管道水锤防护需从工程手段、技术措施、运行管理等多方面分析,综合制定水锤防护方案,消除水锤对工程安全的影响。With the expanding of urban water consumption,the long distance water conveyance project is increasing day by day,and the project safety is seriously threatened by water hammer.In order to solve the water hammer damage in Lijiahe Reservoir's water conveyance project because of its long distance pipeline and fluctuating ground,such the measures as pipeline segmentation,valve selection,operation control and so on are adopted for the integrated design of water hammer prevention,and the characteristics method is used for the numerical simulation and calculation,effectively protecting the project safety.Through the systematic analyses for project methods,technical measures and operation guidance,the prevention design for the water hammer damage is made so as to eliminate the water hammer influence on project security.

关 键 词:长距离重力流压力输水 工程安全 水锤防护 管道分段 技术措施 运行控制 

分 类 号:TV672[水利工程—水利水电工程]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象