检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
出 处:《中国给水排水》2012年第12期51-54,共4页China Water & Wastewater
摘 要:唐山市曹妃甸生态城生活污水压力输送工程项目地处海岸区域,土质松散,地势标高低,地下水位高,从而给管线深埋敷设带来很大困难。该区域排水收水范围很大,污水排出口距污水处理厂距离约为2 km,传统的重力流排放系统会造成管线埋设很深,给施工带来很大的困难,为此提出了压力输送污水的方案。首创一体化压力排水装置,具有截污、污物粉碎、水力提升、自动反洗等功能,为压力排水技术的发展作出有益的探索。Tangshan Caofeidian eco-city sewage pressure conveyance project is located in coastal areas where the soil is loose, the terrain elevation is low, and the underground water level is high. The unfavorable factors mentioned above cause great difficulties to the laying of pipelines. Servicing region of sewage pipe network is large, and the distance from the first drainage well to the sewage water treatment plant is about 2 kin. The traditional gravity flow drainage system requires the pipeline to be deep buried, which causes great difficulties to the construction, high investment and long construction period. There- fore, a pressure drainage scheme was put forward. The integrated pressure drainage equipment was devel- oped. The equipment has functions such as sewage interception, crushing, hydraulic lift and automatic backwash. The new project is a useful exploration for the development of pressure drainage technology.
关 键 词:污水压力输送 黑灰水 一体化全自动排水泵站 切割泵 压力排水检查井
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.28